Monday, December 15, 2008

December Update

I have been so busy with construction details, fiscal year-end audit, and budgeting, that I have not had an opportunity in the past few months to bring you an update on construction. A great deal has taken place with most of the trades already past the rough-in stage of their work. The drilling of the geothermal wells is now complete and ready to be tied into the mechanical equipment in the next few months.

The construction team is currently in the process of enclosing the building. The gutters are being hung, the glass is being set in the window frames, and the exterior stone veneer is being installed. Once these have been accomplished and the exterior sealed, interior work will explode with activity. We cannot wait for the public to survey the spectacular views from the two upper levels looking over the majestic Hudson River, the eastern shoreline in the distance, and the Tappan Zee Bridge.

Below are floor plans of the new and expanded Library – a sneak preview for those lucky enough to visit this web page. The Computer Resource Center is still under development, so the design shown is not complete. In fact, these plans continue to be tweaked and improved upon as the building goes up. You can click on these plans and see a larger view to better see the details.

Stephen Hoefer, MBA
Manager of Operations & Finance
845-358-3370 x33

LOWER LEVEL FLOOR PLANS


MAIN LEVEL FLOOR PLANS


UPPER LEVEL FLOOR PLANS